Maintenance for ICE 4 Trains in Record Time
Deutsche Bahn’s new ICE 4 plant in Cottbus required technical equipment to support high-frequency maintenance work. The aim was to shorten maintenance times and optimize processes such as changing chassis components.
- Industry: Rail Technology
- Period: 2023 to 2024
- Location: Cottbus, Germany


Projektumsetzung im Detail
BÜTER Hebetechnik GmbH designed and supplied several machines that were precisely tailored to the maintenance requirements of the ICE 4 trains. The components for bogies, wheelsets and batteries were seamlessly integrated into the new plant and enable standardized replacement within short cycle times.
The system includes bogie changers including transport bogies, support options for wagon bodies, an autonomous transport vehicle for bogies and other mobile and stationary technology.
Facts and Figures
- Model: Lifting technology for component changes
- Payload: 25000 kg
Technische Besonderheiten
Modular design for maintenance lines
High availability and maintenance-friendly design
Precision control for heavy and sensitive assemblies
Outcome and Added Value for the Project
Thanks to the customized machines from BÜTER Hebetechnik GmbH, Deutsche Bahn can ensure highly available maintenance. The plant sets new standards in terms of efficiency and process speed.